A6 BMK resetting learned values DPF

Status
Not open for further replies.
   #1  

Optron

New Member
Joined
Jun 16, 2017
Messages
6
Reaction score
0
Location
Sweden
Hallo,
greetings from Sweden.
I have a problem to reset values for DPF after it was cleaned (oil ash value 51 when Audi limitation is 49). When going to Long adaptation Channel 081 I can only set as new value 1 (not recommended 0001) and confirm it by Test, then Test value appear as "0" but both Test and Save stay disabled. Only when I try to set "0" the option "Save" is available. No changes to MVB 104 (oil ash, soot calc/meas and distance) occur. Any idea what is wrong or what I do wrong?

Code:
Wednesday,21,June,2017,15:07:28:52626
VCDS -- Windows Based VAG/VAS Emulator Running on Windows 7 x64
VCDS Version: 17.1.3.0 (x64)
Data version: 20170320 DS267.7
www.Ross-Tech.com


VIN: WAUZZZ4F26N179134   License Plate: AJX
Mileage: 365180km-226912mi   Repair Order: 



--------------------------------------------------------------------------------
--------------------------------------------------------------------------------


Chassis Type: 4F (4F0)
Scan: 01 02 03 05 07 08 09 0E 15 16 17 19 37 42 46 47 4F 52 53 55
          56 61 62 72 76 77

VIN: WAUZZZ4F26N179134   Mileage: 365180km-226912miles

00-Steering Angle Sensor -- Status: OK 0000
01-Engine -- Status: Malfunction 0010
02-Auto Trans -- Status: OK 0000
03-ABS Brakes -- Status: OK 0000
05-Acc/Start Auth. -- Status: OK 0000
07-Control Head -- Status: OK 0000
08-Auto HVAC -- Status: OK 0000
09-Cent. Elect. -- Status: OK 0000
0E-Media Player 1 -- Status: OK 0000
15-Airbags -- Status: OK 0000
16-Steering wheel -- Status: OK 0000
17-Instruments -- Status: OK 0000
19-CAN Gateway -- Status: OK 0000
25-Immobilizer -- Status: OK 0000
37-Navigation -- Status: OK 0000
42-Door Elect, Driver -- Status: OK 0000
46-Central Conv. -- Status: OK 0000
47-Sound System -- Status: OK 0000
4F-Centr. Electr. II -- Status: OK 0000
52-Door Elect, Pass. -- Status: OK 0000
53-Parking Brake -- Status: OK 0000
55-Headlight Range -- Status: OK 0000
56-Radio -- Status: OK 0000
61-Battery Regul. -- Status: OK 0000
62-Door, Rear Left -- Status: OK 0000
72-Door, Rear Right -- Status: OK 0000
76-Park Assist -- Status: OK 0000
77-Telephone -- Status: OK 0000
 
-------------------------------------------------------------------------------
Address 01: Engine        Labels: User\059-907-401-ASB.clb
   Part No SW: 4F0 910 401 S    HW: 4F0 907 401 C
   Component: 3.0L V6TDI  G000AG  0040  
   Revision: --H02---    Serial number:               
   Coding: 0011372
   Shop #: WSC 66565 257 00032
   VCID: 2C5D15EA8FC6A52165-8078

1 Fault Found:
009263 - Diesel Particulate Filter (Bank 1) 
               P242F - 001 - Restricted/Clogged - MIL ON
             Freeze Frame:
                    Fault Status: 11100001
                    Fault Priority: 0
                    Fault Frequency: 1
                    Reset counter: 255
                    Mileage: 365180 km
                    Time Indication: 0
                    Date: 2017.06.21
                    Time: 14:58:15

             Freeze Frame:
                    RPM: 0 /min
                    (no units): 0.0
                    (no units): 32.0
                    (no units): 22.0
                    Temperature: 17.7°C
                    Absolute Pres.: 0.0 mbar
                    Pressure: 0 mbar

Readiness: 0 0 1 1 1 

-------------------------------------------------------------------------------
Address 02: Auto Trans        Labels: 09L-927-760.lbl
   Part No SW: 4F1 910 156 S    HW: 09L 927 156 A
   Component: AG6 09L 3,0 TDI RdW 0020  
   Revision: --H01---    Serial number:        4168926
   Coding: 0000001
   Shop #: WSC 02325 785 00200
   VCID: 346D0D8A57F6FDE13D-8060

No fault code found.

-------------------------------------------------------------------------------
Address 03: ABS Brakes        Labels: 4F0-910-517.lbl
   Part No SW: 4F0 910 517 L    HW: 4F0 614 517 L
   Component: ESP 8.0 quattro H05 0090  
   Revision: 00000000    Serial number: 00000000000000
   Coding: 0020872
   Shop #: WSC 02325 785 00200
   VCID: 2D5B18EEB4DCAC2972-8078

No fault code found.

-------------------------------------------------------------------------------
Address 05: Acc/Start Auth.        Labels: 4F0-910-852.clb
   Part No SW: 4F0 910 852     HW: 4F0 905 852 B
   Component: FBSAUDIC6 ELV   H31 0220  
   Revision: 31050601    Serial number: 10601000398730
   Coding: 0000131
   Shop #: WSC 40970 222 87061
   VCID: 63CFBED6A2982A5994-8036

   Subsystem 1 - Part No: 4F0 910 131 E
   Component: FBSAUDIC6 EZS   H45 0080

   Subsystem 2 - Part No: 4F0 910 220 D
   Component: FBSAUDIC6 IDG   H01 0040

No fault code found.

-------------------------------------------------------------------------------
Address 07: Control Head        Labels: 4F0-910-7xx-07-H.clb
   Part No SW: 4F0 910 730 F    HW: 4E0 035 729 
   Component: Interfacebox    H43 2120  
   Revision: 00000000    Serial number: 350DO067668313
   Coding: 0001001
   Shop #: WSC 40972 222 86801
   VCID: 244DFDCAE7166D61AD-8070

   Subsystem 1 - Part No: 4F0 910 609 E
   Component: Bedienteil MMIC6H08 0050

   Subsystem 2 - Serial number: 00000000380511

   Subsystem 3 - Serial number: 0131.03.060000000100011186ÿ

   Subsystem 4 - Serial number: 011186ÿ

No fault code found.

-------------------------------------------------------------------------------
Address 08: Auto HVAC        Labels: 4F0-910-043.clb
   Part No SW: 4F0 910 043     HW: 4F1 820 043 S
   Component: KLIMABETAETIGUNGH12 0170  
   Revision: 00000030    Serial number: 00000030113313
   Coding: 0000278
   Shop #: WSC 02325 785 00200
   VCID: 5BBF86369AE81299DC-800E

No fault code found.

-------------------------------------------------------------------------------
Address 09: Cent. Elect.        Labels: 4F0-910-279.lbl
   Part No SW: 4F0 910 279 D    HW: 4F0 907 279 
   Component: ILM Fahrer      H15 0190  
   Revision: 00000000    Serial number: 4F0907279     
   Coding: 0012121
   Shop #: WSC 02335 785 00200
   VCID: 2A5113F28532BB1197-807E

   Subsystem 1 - Part No: 4F1 910 113   Labels: 1KX-955-119.CLB
   Component: Wischer AudiC6  H05 0150  
   Coding: 00062736
   Shop #: WSC 02335  

   Subsystem 2 - Part No: 4E0 910 557 A  Labels: 8K0-955-559.CLB
   Component: REGENLICHTSENSORH12 0090  
   Coding: 00141886
   Shop #: WSC 02335  

No fault code found.

-------------------------------------------------------------------------------
Address 0E: Media Player 1        Labels: 4E0-910-111.lbl
   Part No SW: 4E0 910 111 F    HW: 4E0 035 111 A
   Component: CD-Changer      H44 0470  
   Revision: 00000000    Serial number: AUZ5ZBF8092263
   Shop #: WSC 00000 000 00000
   VCID: 1C3DC52ADF6655A115-8048

No fault code found.

-------------------------------------------------------------------------------
Address 15: Airbags        Labels: 4F0-910-655-8R.clb
   Part No SW: 4F0 910 655 E    HW: 4F0 959 655 B
   Component: 42 AIRBAG AUDI8RH29 0280  
   Revision: 08H29000    Serial number: 0037LD0DZT91  
   Coding: 0013362
   Shop #: WSC 02325 785 00200
   VCID: 2953ECFE8034B0099E-807C

   Subsystem 1 - Serial number: 6332CSME11332564T

   Subsystem 2 - Serial number: 6342CSME10430931Q

   Subsystem 3 - Serial number: 6352QSME0D0C3941J

   Subsystem 4 - Serial number: 6362QSME0D412F5BT

   Subsystem 5 - Serial number: 63734SME0C7C2113$

   Subsystem 6 - Serial number: 63834SME0C2D7A115

No fault code found.

-------------------------------------------------------------------------------
Address 16: Steering wheel        Labels: 4F0-910-549.lbl
   Part No SW: 4F0 910 549     HW: 4F0 953 549 A
   Component: Lenksäulenmodul H07 0230  
   Revision: 00H07000    Serial number: 90055060930026
   Coding: 0002042
   Shop #: WSC 02323 785 00200
   VCID: 66C9A7C251AA5F7173-8032

   Subsystem 1 - Part No: XXXXXXXXXXX 
   Component: Lenkradmodul    H07 0090

No fault code found.

-------------------------------------------------------------------------------
Address 17: Instruments        Labels: 4F0-910-xxx-17.lbl
   Part No SW: 4F0 910 930 A    HW: 4F0 920 931 F
   Component: KOMBIINSTR. M73 H17 0660  
   Revision: 00400000    Serial number: 4PV515746     
   Coding: 2049043
   Shop #: WSC 38060 000 1048576
   VCID: 2143F4DEF8047849C6-8074

No fault code found.

-------------------------------------------------------------------------------
Address 19: CAN Gateway        Labels: 4F0-910-468.clb
   Part No SW: 4F0 910 468 A    HW: 4F0 907 468 D
   Component: Gateway         H11 0070  
   Revision: 11          Serial number: 13008063278236
   Coding: ECFE73C41B3104
   Shop #: WSC 02334 785 00200
   VCID: 2757EAC69620867988-8072

No fault code found.

-------------------------------------------------------------------------------
Address 37: Navigation        Labels: 4E0-910-88x-37.lbl
   Part No SW: 4E0 910 888 P    HW: 4E0 919 887 C
   Component: MNS ECE         H45 1060  
   Revision: 00000000    Serial number: 305IX057637817
   Shop #: WSC 02327 785 00200
   VCID: 3B7F26B67AA83299FC-806E

No fault code found.

-------------------------------------------------------------------------------
Address 42: Door Elect, Driver        Labels: 4F0-910-793-42.lbl
   Part No SW: 4F0 910 793 E    HW: 4F0 959 793 E
   Component: TSG FA          H12 0120  
   Revision: 00-00000    
   Coding: 0001642
   Shop #: WSC 02327 785 00200
   VCID: 2C5D15EA8FC6A52165-8078

No fault code found.

-------------------------------------------------------------------------------
Address 46: Central Conv.        Labels: 4F0-910-289.lbl
   Part No SW: 4F0 910 289 G    HW: 4F0 907 289 G
   Component: Komfortgeraet   H22 0170  
   Revision: 01700022    Serial number: 01012194340000
   Coding: 0139909
   Shop #: WSC 02335 785 00200
   VCID: 2E591FE2B9DAD7314B-807A

No fault code found.

-------------------------------------------------------------------------------
Address 47: Sound System        Labels: 4F0-910-223-AS.lbl
   Part No SW: 4F0 910 223 C    HW: 4F0 035 223 
   Component: Amp.-ASK        H10 0320  
   Revision: 34S00001    Serial number: 00404060250884
   Coding: 0000102
   Shop #: WSC 02335 785 00200
   VCID: 1E39CF22C97A47B1FB-804A

No fault code found.

-------------------------------------------------------------------------------
Address 4F: Centr. Electr. II        Labels: 4F0-910-280.lbl
   Part No SW: 4F0 910 280     HW: 4F0 907 280 
   Component: ILM Beifahrer   H10 0080  
   Revision:             Serial number: 00000000133358
   Coding: 0001003
   Shop #: WSC 02323 785 00200
   VCID: 5EB98F2289FA07B1BB-800A

No fault code found.

-------------------------------------------------------------------------------
Address 52: Door Elect, Pass.        Labels: 4F0-910-793-52.lbl
   Part No SW: 4F0 910 793 E    HW: 4F0 959 792 E
   Component: TSG BF          H12 0120  
   Revision: 00-00000    
   Coding: 0001642
   Shop #: WSC 02327 785 00200
   VCID: 2C5D15EA8FC6A52165-8078

No fault code found.

-------------------------------------------------------------------------------
Address 53: Parking Brake        Labels: 4F0-910-801.clb
   Part No SW: 4F0 910 801 A    HW: 4F0 907 801 
   Component: EPB  CA3C0040   H03 0040  
   Revision: --H03---    
   Coding: 0000321
   Shop #: WSC 02324 785 00200
   VCID: 1E39CF22C97A47B1FB-804A

No fault code found.

-------------------------------------------------------------------------------
Address 55: Headlight Range        Labels: 8P0-907-357.lbl
   Part No: 8P0 907 357 F
   Component: Dynamische LWR  H02 0010  
   Revision: 00000001    Serial number:               
   Coding: 0000003
   Shop #: WSC 02325 785 00200
   VCID: 3D7B28AE64BC3CA9C2-8068

No fault code found.

-------------------------------------------------------------------------------
Address 56: Radio        Labels: 4E0-910-541.lbl
   Part No SW: 4E0 910 541 L    HW: 4F0 035 541 E
   Component: TUNER EU/US/RDW H42 0560  
   Revision: 00000000    Serial number: 352DN067640617
   Coding: 0000001
   Shop #: WSC 02323 785 00200
   VCID: 2953ECFE8034B0099E-807C

No fault code found.

-------------------------------------------------------------------------------
Address 61: Battery Regul.        Labels: 4F0-910-181.lbl
   Part No SW: 4F0 910 181 E    HW: 4F0 915 181 A
   Component: J0644 BEM       H12 0590  
   Revision: 00000000    Serial number: 00000000006274
   Shop #: WSC 02241 127 82691
   VCID: 234FFED6E2186A59D4-8076

   Subsystem 1 - Part No: 4F0 915 105 D
   Component: von VA0  1603300690       
   Coding: 344630393135313035442056413031363033333030363930
   Shop #: WSC 00000 384 00290

No fault code found.

-------------------------------------------------------------------------------
Address 62: Door, Rear Left        Labels: 4F0-910-795.lbl
   Part No SW: 4F0 910 795 E    HW: 4F0 959 795 E
   Component: TSG HL          H21 0050  
   Coding: 0001066
   Shop #: WSC 02327 785 00200
   VCID: 2E591FE2B9DAD7314B-807A

No fault code found.

-------------------------------------------------------------------------------
Address 72: Door, Rear Right        Labels: 4F0-910-795.lbl
   Part No SW: 4F0 910 795 E    HW: 4F0 959 794 E
   Component: TSG HR          H21 0050  
   Coding: 0001066
   Shop #: WSC 02327 785 00200
   VCID: 2E591FE2B9DAD7314B-807A

No fault code found.

-------------------------------------------------------------------------------
Address 76: Park Assist        Labels: 4Fx-910-283.lbl
   Part No SW: 4F0 910 283 E    HW: 4F0 919 283 E
   Component: Parkhilfe 8-Kan H12 0020  
   Revision: 00H12000    Serial number: 11820608600592
   Coding: 0201016
   Shop #: WSC 131071 1023 2097151
   VCID: 2649E7C2912A9F71B3-8072

No fault code found.

-------------------------------------------------------------------------------
Address 77: Telephone        Labels: 4E0-910-336.lbl
   Part No SW: 4E0 910 336 M    HW: 4E0 862 335 
   Component: Handyvorb2      H20 1130  
   Revision: 00000000    Serial number: 00000005320156
   Coding: 0010920
   Shop #: WSC 40972 222 86801
   VCID: 2C5D15EA8FC6A52165-8078

No fault code found.

End-------------------------(Elapsed Time: 02:36)--------------------------

Code:
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------


Long Adaptation Channel 081:
Stored value 0
Test value 0
Diesel Particle Filter (DPF) Replacement
       
       
       
       


--------------------------------------------------------------------------------
--------------------------------------------------------------------------------


Address 01: DTCs cleared
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------


Address 01,4F0 910 401 S,channel 81,adapted from,0,to,0,
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------


Address 01: DTCs cleared
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------


Long Adaptation Channel 081:
Stored value 0
Test value 0
Diesel Particle Filter (DPF) Replacement
       
       
       
       


--------------------------------------------------------------------------------
--------------------------------------------------------------------------------


Address 01,4F0 910 401 S,channel 81,adapted from,0,to,0,
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------


Address 01: DTCs cleared
 
Last edited by a moderator:
   #2  

Uwe

Benevolent Dictator
Administrator
Joined
Jan 29, 2014
Messages
49,725
Reaction score
34,021
Location
USA
VCDS Serial number
HC100001
When going to Long adaptation Channel 081 I can only set as new value 1 (not recommended 0001)
Why not? Are you actually typing 0001 into the New Value field? If so, what exactly happens?

Maybe post some screen-shots?

-Uwe-
 
   #3  

Optron

New Member
Joined
Jun 16, 2017
Messages
6
Reaction score
0
Location
Sweden
Trying both with 1 and 0001. I push Test then as Test value "0" appear, both "Test" and "Save" buttons are disabled.
Only when change Test value to "0" I am allowed to Save after Test
 
   #4  

Optron

New Member
Joined
Jun 16, 2017
Messages
6
Reaction score
0
Location
Sweden
When going to Long adaptation Channel 081 I can only set as new value 1 (not recommended 0001) = when using "Up" & "Down" selection buttons. I can type 0001 into the window, but results as descripted above
 
   #5  

Optron

New Member
Joined
Jun 16, 2017
Messages
6
Reaction score
0
Location
Sweden
is it so that G450 (exhaust pressure sensor) reset must be done before any way first? DPF was not exchanged but only cleaned. G450 working correct (zero reading when key on engine off)
 
   #6  

NEtech

VCDS Distributor
VCDS Distributor
Joined
Feb 7, 2014
Messages
3,586
Reaction score
5,721
Location
Denmark
VCDS Serial number
C?ID=56995
If I am not mistaken, a software update for engine is necessary to use channel 81.
Why do you think a cleaning, removes all ash :confused:
You should also be able to use channel 82.
 
  • Like
Reactions: Uwe
   #7  

Optron

New Member
Joined
Jun 16, 2017
Messages
6
Reaction score
0
Location
Sweden
thanks NEtech, seems be you right, just find info about TPI2012786 - without engine software update no way to adapt channel 81 or recalibrate G450. I mind time to spend money by Audi:mad:
Cleaning was done by professional company (measurement before and after process, warranty)
Channel 82 - what it it function?
 
   #8  

NEtech

VCDS Distributor
VCDS Distributor
Joined
Feb 7, 2014
Messages
3,586
Reaction score
5,721
Location
Denmark
VCDS Serial number
C?ID=56995
Cleaning was done by professional company (measurement before and after process, warranty)

Still, no one can tell if it is soot, ash (or items of the filter material!) or other items that are removed!
My opinion is, if you want to drive a diesel, then buy a new (original) particulate filter, when it is necessary.

Channel 82 - what it it function?
Mileage of particulate filter divided 1000, used, if for example ECU is changed.
 
   #9  

Optron

New Member
Joined
Jun 16, 2017
Messages
6
Reaction score
0
Location
Sweden
well, if Audi (VAG) offer the new PDF to reasonable price yes, but I don't like to pay almost 2K EUR for it, except the labour cost where only flashing of new software is priced to just under 200 EUR (and can be done first in the middle of September):mad:. Cost of new pdf is close to 5% of new car in standard configuration, so it is difficult to say "reasonable",specially in my case for car driven over 360k km. I am happy that it happened first now, not by half of distance which is not common but usually.
So I trust company which working only with this issue (regeneration of PDF), both for personal car but mostly for heavy equipment where this procedure is common. And I am very confuse about future as rumors about new regulations - requirement of pdf for petrol motors too.
Why no "open PDF" (as in heavy trucks or construction machines) is installed in any personal car allowing removing & cleaning to reasonable cost for user?
 
Status
Not open for further replies.
Back
Top