Results 1 to 4 of 4

Thread: 2003 Audi Allroad 2.7 Auto ABS/ESP/BRAKE/SUSPENTION LIGHTS

  1. #1
    Verified VCDS User
    Join Date
    Aug 2019
    Location
    USA
    Posts
    2
    Post Thanks / Like

    2003 Audi Allroad 2.7 Auto ABS/ESP/BRAKE/SUSPENTION LIGHTS

    Hello i recently replaced the front sub-frame on the car and the front brakes and axles at the same time car was in bad need of alignment and tires so i took it to the local tire shop (car had no warning lights at the time) after tires and alignment i am getting ABS/ESP/BRAKE WARNING BEEPS 3 TIMES AND SUSPENSION LIGHT. below is the full scan i have checked all brake connections and all seem good.
    any info would be appreciated
    Thanks!

    Code:
    Thursday,15,August,2019,08:35:31:33679
    VCDS -- Windows Based VAG/VAS Emulator Running on Windows 10 x64
    VCDS Version: 19.6.1.0 (x64)  HEX-V2 CB: 0.4508.4
    Data version: 20190529 DS308.0
    www.Ross-Tech.com
    
    
    VIN: WA1YD64B33N057266   License Plate: 
    
    
    Chassis Type: 4B (4B - Audi A6/S6/RS6/allroad C5 (1998 > 2005))
    Scan: 01 02 03 06 08 15 16 17 18 22 34 35 36 37 45 55 56 57 65 67
              75 76 77
     
    VIN: WA1YD64B33N057266   
    -------------------------------------------------------------------------------
    Address 01: Engine        Labels: 078-907-551-AZA.lbl
       Part No: 4Z7 907 551 S
       Component: 2.7L V6/5VT     G   0020  
       Coding: 07755
       Shop #: WSC 01312  
       VCID: 53F37FC032ED706F27B-5160
       WA1YD64B33N057266     AUZ7Z0B2248790
    
    2 Faults Found:
    18057 - Powertrain Data Bus 
                P1649 - 35-10 - Missing Message from ABS Controller - Intermittent
    17867 - Exhaust Gas Temp Sensor 2 (G236) 
                P1459 - 35-10 - Implausible Signal - Intermittent
    Readiness: 0000 0100
    
    -------------------------------------------------------------------------------
    Address 02: Auto Trans        Labels: 01V-927-156.lbl
       Part No: 4Z7 927 156 M
       Component: AG5 01V 2.7l5VT USA 2122  
       Coding: 01002
       Shop #: WSC 02325  
       VCID: 50F970CC03FB0B771A9-5160
    
    No fault code found.
    
    -------------------------------------------------------------------------------
    Address 03: ABS Brakes        Labels: 8D0-907-389.lbl
       Part No: 4Z7 907 389 A
       Component: ABS/ESP allrad      D56  
       Coding: 06497
       Shop #: WSC 02325  
       VCID: 4ACD62A4E5A731A754D-5160
    
    2 Faults Found:
    01486 - System Function Test Activated 
                35-00 - -
    01420 - High Pressure Switch Valve 1 for Electronic Stability Program (N227) 
                35-00 - -
    
    -------------------------------------------------------------------------------
    Address 08: Auto HVAC        Labels: 4B0-820-043-MY2.lbl
       Part No: 4B0 820 043 AM
       Component: A6-Klimavollautomat 0105  
       Coding: 00010
       Shop #: WSC 02325  
       VCID: 6597B1186C49FEDF59F-2586
    
    2 Faults Found:
    00716 - Air recirculation Flap Positioning Motor (V113) 
                41-10 - Blocked or No Voltage - Intermittent
    01592 - Air Quality Sensor (G238) 
                57-00 - Electric Circuit Failure
    
    -------------------------------------------------------------------------------
    Address 15: Airbags        Labels: 4B0-959-655-AI84.lbl
       Part No: 4Z7 959 655 J
       Component: Airbag 8.4EP        2000  
       Coding: 0000607
       Shop #: WSC 02325 785 00200
       VCID: 56F586D4241F6547C05-5184
    
    No fault code found.
    
    -------------------------------------------------------------------------------
    Address 16: Steering wheel        Labels: 4B0-907-487.lbl
       Part No: 4B0 907 487 F
       Component: Lenkradelektronik   D01   
       Coding: 01002
       Shop #: WSC 02325  
       VCID: 2F3B13307E35748F633-5184
    
    No fault code found.
    
    -------------------------------------------------------------------------------
    Address 17: Instruments        Labels: 4B0-920-xxx-17.lbl
       Part No: 4B0 920 981 P
       Component: KOMBI+WEGFAHRS. VDO D12  
       Coding: 06264
       Shop #: WSC 19411  
       VCID: 33331F40922D506F07B-5160
       WA1YD64B33N057266     AUZ7Z0B2248790
    
    No fault code found.
    
    -------------------------------------------------------------------------------
    Address 34: Level Control        Labels: 4Z7-907-553.lbl
       Part No: 4Z7 907 553 E
       Component:  - 2C1A1          D040    
       Coding: 25500
       Shop #: WSC 00001  
       VCID: 47CB5B90F6B5CCCF4B3-513C
    
    2 Faults Found:
    01316 - ABS Control Module 
                79-00 - Please Check Fault Codes
    01316 - ABS Control Module 
                79-00 - Please Check Fault Codes
    
    -------------------------------------------------------------------------------
    Address 35: Centr. Locks        Labels:. 4B0-962-258.clb
       Part No: 4B0 962 258 M
       Component: Central Lock/Alarm  D37  
       Coding: 15885
       Shop #: WSC 02325  
       VCID: 33331F40921D506F07B-4F0C
    
    1 Fault Found:
    01562 - Rear right door 
                59-10 - Can't Unlock - Intermittent
    
    -------------------------------------------------------------------------------
    Address 36: Seat Mem. Drvr        Labels: None
       Part No: 4B0 959 760 B
       Component: Sitzmemory R1 F     0102  
       Coding: 00001
       Shop #: WSC 00000  
       VCID: 2C01043C4F230F97461-4B1E
    
    No fault code found.
    
    -------------------------------------------------------------------------------
    Address 55: Headlight Range        Labels: 4Z7-907-357.lbl
       Part No: 4Z7 907 357 
       Component: dynamische LWR       D09  
       Coding: 00030
       Shop #: WSC 02325  
       VCID: 04518C9C873327D7EE1-4B1E
    
    1 Fault Found:
    00532 - Supply Voltage B+ 
                07-10 - Signal too Low - Intermittent
    
    -------------------------------------------------------------------------------
    Address 56: Radio        Labels: 8E0-035-1xx-56.lbl
       Part No: 4B0 035 195 L
       Component: symphony II NP2    0051   
       Coding: 00205
       Shop #: WSC 01312  
       VCID: 290FFD2840D11ABFBD7-4E62
    
    No fault code found.
    
    End----------(Elapsed Time: 04:53, VBatt start/end: 12.4V/12.3V)-----------
    Last edited by Boki Ar; 08-15-2019 at 08:25 AM. Reason: [Code] Tags

  2. #2
    Benevolent Dictator Uwe's Avatar
    Join Date
    Jan 2014
    Location
    Earth
    Posts
    24,190
    Post Thanks / Like
    Blog Entries
    1
    The engineering problems are likely insurmountable. It would be like proposing to land a rocket booster section on a barge floating in the middle of the ocean.

  3. Likes Dana liked this post
  4. #3
    Verified VCDS User
    Join Date
    Aug 2019
    Location
    USA
    Posts
    2
    Post Thanks / Like
    Quote Originally Posted by Uwe View Post
    Yes I have checked the fuses and wiring but was hoping it was not the ABS control module faulty as none of these lights were on till right after the alignment?

  5. Likes Dana liked this post
  6. #4
    Ross-Tech Employee Dana's Avatar
    Join Date
    Jan 2014
    Location
    United States
    Posts
    3,596
    Post Thanks / Like
    N227 is part of N55 (providing diagram # 46/4 is correct) so I believe the alignment was unrelated.

  7. Likes Uwe liked this post

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •