- Joined
- Aug 12, 2019
- Messages
- 7
- Reaction score
- 3
- Location
- Los Angeles, USA
- VCDS Serial number
- C?ID=374155
Hello All!
New to Ross-Tech, VCDS, and the forum - looks like a cool place!
So, I've just spent the last two years rebuilding a B7 S4, I rebuilt the engine, and the mechatronics unit with new solenoids, separator plate, stem seals, etc. Before installing the engine, I also replaced brittle connectors on just about every plug in the engine bay with new ones.
I've started the car and driven around the neighborhood - the engine runs great but it shocks into gear on every shift (even 6th!). I expected like this if it had learned poorly flowing old solenoids during it's past life, but my problem is I cannot get the transmission to reset learned values. The Basic Settings button under automatic transmission is grayed out on VCDS and I cannot select it. I tried Adaptives Reset with moving forward and backward 20meters, but that doesn't seem to have helped at all. If someone could help guide me on how to activate the transmission learned values reset, I'd appreciate it.
Second issue - ESP G419 No Communication. I thought maybe the unit died while the car sat as a shell for a few years, or maybe a voltage spike, etc. etc. I replaced the unit and the ESP light and ABS light are still on. All the fuses on driver side dash are OK, battery voltage is OK, in VCDS I can see plausible wheel speeds from all four corners, steering sensor plausible values too. Not sure where to look next. Some suggestions would be appreciated!
New to Ross-Tech, VCDS, and the forum - looks like a cool place!
So, I've just spent the last two years rebuilding a B7 S4, I rebuilt the engine, and the mechatronics unit with new solenoids, separator plate, stem seals, etc. Before installing the engine, I also replaced brittle connectors on just about every plug in the engine bay with new ones.
I've started the car and driven around the neighborhood - the engine runs great but it shocks into gear on every shift (even 6th!). I expected like this if it had learned poorly flowing old solenoids during it's past life, but my problem is I cannot get the transmission to reset learned values. The Basic Settings button under automatic transmission is grayed out on VCDS and I cannot select it. I tried Adaptives Reset with moving forward and backward 20meters, but that doesn't seem to have helped at all. If someone could help guide me on how to activate the transmission learned values reset, I'd appreciate it.
Second issue - ESP G419 No Communication. I thought maybe the unit died while the car sat as a shell for a few years, or maybe a voltage spike, etc. etc. I replaced the unit and the ESP light and ABS light are still on. All the fuses on driver side dash are OK, battery voltage is OK, in VCDS I can see plausible wheel speeds from all four corners, steering sensor plausible values too. Not sure where to look next. Some suggestions would be appreciated!
Code:
Sunday,11,August,2019,15:39:27:57034
VCDS -- Windows Based VAG/VAS Emulator Running on Windows 7 x64
VCDS Version: 19.6.1.0 (x64) HEX-V2 CB: 0.4508.4
Data version: 20190529 DS308.0
www.Ross-Tech.com
VIN: WAUGL68E35A497598 License Plate:
Mileage: 237320km-147463mi Repair Order:
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Chassis Type: 8E (8E - Audi A4/S4/RS4 B6/B7 (2001 > 2008))
Scan: 01 02 03 08 09 0F 11 15 16 17 18 25 36 37 45 46 55 56 57 65
67 69 75 76 77
VIN: WAUGL68E35A497598 Mileage: 237320km-147463miles
-------------------------------------------------------------------------------
Address 01: Engine Labels: 079-910-560-BBK.lbl
Part No SW: 8E0 910 560 M HW: 4E0 907 560
Component: 4.2L V8/5V G 0010
Revision: -------- Serial number:
Coding: 0007771
Shop #: WSC 06335 000 00000
VCID: 2F3B138C0B10A0DF633-807A
2 Faults Found:
18043 - Powertrain Data Bus
P1635 - 008 - Missing Message from A/C Controller - Intermittent
18010 - Power Supply Terminal 30
P1602 - 002 - Voltage too Low
Readiness: 0110 1101
-------------------------------------------------------------------------------
Address 02: Auto Trans Labels: 09L-927-760.lbl
Part No SW: 8E0 910 156 M HW: 09L 927 156
Component: AG6 09L 4.2L5V USA 0040
Revision: --H01--- Serial number: 0087005
Coding: 0000002
Shop #: WSC 06335 000 00000
VCID: 303910F0162EBF277A9-8064
No fault code found.
-------------------------------------------------------------------------------
Address 03: ABS Brakes Labels: 8E0-910-517.clb
Part No SW: 8E0 910 517 C HW: 8E0 614 517 BB
Component: ESP8 quattro H04 0180
Revision: 00000000 Serial number: 00000000000000
Coding: 0004902
Shop #: WSC 06335 000 00000
VCID: 270BFBAC23E0F89FAB3-8072
3 Faults Found:
00493 - ESP-Sensor Unit (G419)
004 - No Signal/Communication
Freeze Frame:
Fault Status: 01100100
Fault Priority: 2
Fault Frequency: 6
Reset counter: 40
Time Indication: 0
Freeze Frame:
Hex Value: 0x00C0
Hex Value: 0x4302
Hex Value: 0x00FF
Hex Value: 0xFFA7
Hex Value: 0x00FF
01486 - System Function Test Activated
000 - -
Freeze Frame:
Fault Status: 01100000
Fault Priority: 3
Fault Frequency: 9
Reset counter: 40
Time Indication: 0
Freeze Frame:
Hex Value: 0x0000
Hex Value: 0x4222
Hex Value: 0x00FF
Hex Value: 0xFF98
Hex Value: 0x00FF
01826 - Sensor for Steering Angle (G85); Supply Voltage Terminal 30
000 - - - Intermittent
Freeze Frame:
Fault Status: 00100000
Fault Priority: 3
Fault Frequency: 1
Reset counter: 40
Time Indication: 0
Freeze Frame:
Hex Value: 0x0000
Hex Value: 0x4222
Hex Value: 0x00FF
Hex Value: 0xFF91
Hex Value: 0x00FF
-------------------------------------------------------------------------------
Address 08: Auto HVAC Labels: 8E0-820-043.lbl
Part No: 8E0 820 043 AM
Component: A4 Klimaautomat 2731
Coding: 00000
Shop #: WSC 00000
VCID: 6C81C480FF961BC7061-5160
2 Faults Found:
00819 - High Pressure Sensor (G65)
07-10 - Signal too Low - Intermittent
01206 - Signal for Duration of Ignition Off Time
27-00 - Implausible Signal
-------------------------------------------------------------------------------
Address 09: Cent. Elect. Labels: 8E0-907-279-8EC.lbl
Part No: 8E0 907 279 J
Component: int. Lastmodul USA 0503
Coding: 01023
Shop #: WSC 65536
VCID: 392F2DD4C0447E6FCD7-4B00
2 Faults Found:
01326 - Control Module for Multi-Function Steering Wheel (J453)
49-10 - No Communications - Intermittent
01320 - Control Module for Climatronic (J255)
49-10 - No Communications - Intermittent
-------------------------------------------------------------------------------
Address 15: Airbags Labels: 8E0-959-655-94.lbl
Part No SW: 8E0 959 655 H HW: 8E0 959 655 H
Component: Airbag 9.41 H10 3230
Revision: 91H10323 Serial number: 0036N0009PM2
Coding: 0032607
Shop #: WSC 06335 000 00000
VCID: 3C2134C0CA664B47D61-8068
Subsystem 1 - Part No: 8E0 910 339 B
Component: BF-Gewichtsens. 02 0070
Serial number: 6332DRB4016E4928R
Coding: 00032607
Subsystem 2 - Serial number: 6342DRB4016C92A5T
Subsystem 3 - Serial number: 6352ARB4004C81D2M
Subsystem 4 - Serial number: 6362ARB4004D1297J
Subsystem 5 - Serial number: 63729RB4004C9C51Q
Subsystem 6 - Serial number: 63829RB400E31923G
No fault code found.
-------------------------------------------------------------------------------
Address 16: Steering wheel Labels: 8E0-953-549.lbl
Part No: 8E0 953 549 Q
Component: Lenksáulenmodul 0601
Coding: 02141
Shop #: WSC 06335
VCID: 41DF4534A89426AF857-4B00
2 Faults Found:
01317 - Control Module in Instrument Cluster (J285)
49-10 - No Communications - Intermittent
01304 - Radio
49-00 - No Communications
-------------------------------------------------------------------------------
Address 17: Instruments Labels: 8E0-920-9xx-8EC.lbl
Part No SW: 8E0 920 981 Q HW: 8E0 920 981 Q
Component: KOMBI+WFS 4 H12 0040
Revision: 0040 Serial number: 00000000000000
Coding: 0023261
Shop #: WSC 22122 444 92497
VCID: 3B2337DCCF784C7FDFB-5184
3 Faults Found:
01320 - Control Module for Climatronic (J255)
004 - No Signal/Communication - Intermittent
01304 - Radio
004 - No Signal/Communication
01300 - Control Module for Navigation with CD-Rom (J401)
004 - No Signal/Communication
-------------------------------------------------------------------------------
Address 25: Immobilizer Labels: 8E0-920-9xx-8EC.lbl
Part No SW: 8E0 920 981 Q HW: 8E0 920 981 Q
Component: KOMBI+WFS 4 H12 0040
Revision: 0040 Serial number: 00000000000000
Coding: 0023261
Shop #: WSC 22122 444 92497
VCID: 3B2337DCCF784C7FDFB-5184
3 Faults Found:
01320 - Control Module for Climatronic (J255)
004 - No Signal/Communication - Intermittent
01304 - Radio
004 - No Signal/Communication
01300 - Control Module for Navigation with CD-Rom (J401)
004 - No Signal/Communication
-------------------------------------------------------------------------------
Address 36: Seat Mem. Drvr Labels: 8E0-959-760.lbl
Part No: 8E0 959 760
Component: Sitzmemory R2 F 0305
Coding: 00002
Shop #: WSC 00000
VCID: 71BFD5F4D884F62F357-4B3C
2 Faults Found:
01317 - Control Module in Instrument Cluster (J285)
49-10 - No Communications - Intermittent
00466 - Control Module for Steering Column Electronics (J527)
49-10 - No Communications - Intermittent
-------------------------------------------------------------------------------
Address 46: Central Conv. Labels:. 8E0-959-433-MAX.clb
Part No: 8E0 959 433 BT
Component: Komfortgerát T7B 3132
Coding: 11836
Shop #: WSC 06335
VCID: 04518C20F706F387EE1-4B00
Subsystem 1 - Part No: 8E1959801F
Component: Tõrsteuer.FS BRM 0305
Subsystem 2 - Part No: 8E1959802E
Component: Tõrsteuer.BF BRM 0205
Subsystem 3 - Part No: 8E0959801A
Component: Tõrsteuer.HL BRM 0205
Subsystem 4 - Part No: 8E0959802A
Component: Tõrsteuer.HR BRM 0205
4 Faults Found:
01320 - Control Module for Climatronic (J255)
49-00 - No Communications
00962 - Alarm via. Tilt Sensor
35-00 - -
00955 - Key 1
35-10 - - - Intermittent
01331 - Door Control Module; Driver Side (J386)
80-10 - Single-Wire Operation - Intermittent
-------------------------------------------------------------------------------
Address 55: Headlight Range Labels: 4F0-910-357.lbl
Part No SW: 4F0 910 357 C HW: 4F0 907 357 C
Component: AFS 1 H01 0020
Revision: 00000001 Serial number:
Coding: 0000019
Shop #: WSC 06335 000 00000
VCID: 2615F6A824EAE197905-8072
Subsystem 1 - Part No: 8E0 941 329
Component: AFS-Modul links H02 0020
Subsystem 2 - Part No: 8E0 941 329
Component: AFS-Modul rechtsH02 0020
1 Fault Found:
00496 - Sensor for Vehicle Leveling; Front
008 - Implausible Signal - Intermittent
Freeze Frame:
Fault Status: 00101000
Fault Priority: 2
Fault Frequency: 19
Reset counter: 35
Time Indication: 0
End----------(Elapsed Time: 05:02, VBatt start/end: 14.0V/13.9V)-----------